|
Water Supply and STP
 
The campus development has been taken up after adequate care has been taken for sustained water supply. For this water is taken from the channel of Gopi Krishna Sagar Dam Project. A pump house with water storage and treatment is built at Pagara. The treatment facility includes mixing, flocculation, settling, sludge removal and storage. The partly treated water is pumped through 8.2 km long 8" diameter pipe line to JUET campus water treatment facility. The partly treated raw water is pressure filtered, passed through active carbon filter, pH controlled, chlorinated and supplied to the campus. The storage facilities are adequate to meet 7 days requirements when in full strength.
The campus is provided with an extensive network of water distribution pipe lines. There are also a few tube wells in the campus.
Sewerage Treatment Plant
The campus is being provided with a well laid out drainage and sewerage network. A centralized sewerage treatment facility is under construction. The treated water is used for irrigation and maintenance of green cover. The sludge will go as manure.
|